Wednesday, November 2, 2022

Risk Management - Better, Faster, Easier - Software Demo

 Risk Management - Better, Faster, Easier - Software Demo

https://www.youtube.com/watch?v=ZUxo2S5htE8 

Project Management - Better than XLS, but not too complex - Software Demo

Project Management - Better than XLS, but not too complex - Software Demo 

https://www.youtube.com/watch?v=KwFd6Qo9G48 


Monday, May 16, 2022

Highly recommended Data Scientist & Data Engineer available

 

Highly recommended Data Scientist & Data Engineer available.

“Roll up our sleeves” full-service consultant specializing in cloud-based data analytics pipelines. Considering the migration from dusty servers in the basement to the power of the cloud? Let's design, spec, manage, and automate your data processes into seamless reports and data dashboards. Previous projects with financial, research, and operational data teams to shed hours off report requests and thousands off server bills. 

Focus On Your Project, Not Hiring. Connect with Jonathan Cachat, PhD to learn more.

https://www.linkedin.com/in/jcachat/

Friday, April 15, 2022

 

AS9145 Readiness Survey - 2022 Update to previous 2020 survey <2 Min – thank you for your time

https://sprw.io/stt-3fd2c62d2f

Saturday, April 2, 2022

PeProSo PPAP Software Requirements Apr 2 2022

 

PeProSo PPAP Software Requirements Apr 2 2022 

Intended Audience - part manufacturers (your suppliers and/or plants)

 In Scope

- Process Flow Diagram (PFD), PFMEA, Control Plan (CP), Gage Studies (GS), and DFMEA if needed

- PPAP Submission to customers, internal, and from suppliers

 Out of Scope – R&D / design centers - Robust design risk assessment (DRA) - block / boundary diagrams, structure analysis tree structure, parameter diagrams, etc.

 Need versus Want – Need is required, a must have.  Want is a would be nice.  NOTE: The answers vary significantly depending on what role you are asking – oversee, manage, or execute.

 At a very, very minimum, there needs to be a software map like this:

 


Criteria

Need/Want

Yes / No

Comments

 

GENERAL EVALUATION CRITERIA

 

 

 

 

Pricing Model (Enterprise, Sites, Suppliers)

 

 

Yes

 

Pricing Model (Named User, Concurrent User, Read Only User)

 

 

Yes

 

Payments Terms (CapEx or Opex)

 

 

Yes

 

Vendor financial stability

 

 

Yes

 

Vendor expertise / experience

 

 

Yes

 

Installation Options – either on-premise or cloud/SaaS

 

 

Yes

 

Integration available

 

 

Yes

 

Customization available

 

 

Yes

 

Source code available

 

 

Yes

 

Global consulting / training available

 

 

Yes

 

On Suppler site assistance available

 

 

Yes

 

Supports both AIAG 4th Edition and AIAG VDA Edition FMEA

 

 

Yes

 

Complicated User Security settings

 

No

Having to define, designate, and modify user roles and responsibilities (create new, edit, delete, etc.) is too complicated – they will go back to spreadsheets.  Baby step – is this better than spreadsheets?

 

Complicated Workflow management

 

No

Having to define all sorts of rules to automate the PPAP process is too complicated – they will go back to spreadsheets. Baby step – is this better than spreadsheets?

 

Hashtag like search capability

 

Yes

 

 

Spreadsheet Like Screens

 

 

 

A database app should provide similar spreadsheet like capability including:

-        Ability to store personal setup (related to single user)

-        Ability to search/filter each column.

-        Export to spreadsheet (where applicable)

-        Export to PDF (where applicable)

 

Move columns, hide columns, filter columns – real time report writer capability for lists of parts, projects, and studies.

 

In Project Forms – freeze columns, hide columns, etc.

 

Spell Checking

 

 

Yes

Automatic real time spell checking during data entry – no more mistakes from forgetting to run the spell checker in the spreadsheet before submitting documents.

Smart Lookup Filtering

 

Yes

The lookup list gets shorter as information is entered.

Action Tab – My To Do List

 

Yes

A single place to see all your project tasks, across all projects, FMEA action items, and more.

 

Supports multiple/additional languages (i.e., English, Spanish, Chinese, etc.)

 

Yes

More can be added...

 

INITIAL SETUP and CONFIGURATION

 

 

 

 

Ability to import Customer list.

 

 

Yes

 

Ability to import part list.

 

 

Yes

Ability to import Supplier list.

 

 

Yes

 

Manage multiple Gage Study Types

 

 

Yes

 

Manage multiple Operation Types.

 

 

Yes

 

Manage multiple plants / locations,

 

 

Yes

Manage multiple Product Type.

 

 

Yes

 

Manage multiple Product Classification Types.

 

 

Yes

 

Manage multiple Process Classification Types.

 

 

Yes

 

Manage multiple Project Types.

 

 

Yes

 

 

PART RECORDS

 

 

Yes

 

Part Number

 

Yes

Part Number detail includes a few mandatory fields, and then a lot of flexibility, including Search Tags field, like Hashtag capability, for searching and finding information not available in standard fields.

 

Part Revision History

 

 

Yes

A Part Revision History is maintained, with a flexible Revision Level formatting.  This eliminates the need for the old “Part History” form.

Part - Jump to Projects

 

 

Yes

There is a direct link to Projects (PPAP Submission) on the Part Number screen, by revision level.

Part - Import product characteristics

 

 

Yes

 

Part – Geometric Dimensioning and Tolerancing (GD&T) symbols

 

 

Yes

 

Part - Import process characteristics

 

 

Yes

 

Part - Import operations

 

 

Yes

 

Part - Import Bill of Material (BOM)

 

 

Yes

 

Part – Manage projects with multiple part revisions at same time.

 

 

Yes

 

Part – Document revision control

 

 

Yes

 

Part – Track suppliers we buy from

 

 

Yes

 

Part – Manage customer we sell to

 

 

Yes

 

Part – Upload attachments (design record(s), etc.)

 

 

Yes

 

Part Family - Manage reusable product characteristics.

 

 

Yes

 

Part Family - Manage reusable process characteristics.

 

 

Yes

 

Part Family - Manage reusable operations.

 

 

Yes

 

Product Family & reusable knowledge

 

 

Yes

A new PFMEA is not required for every part.  A new Gage Study does not have to be done on every part.  This is a huge cost savings.

 

PROJECTS - PPAP SUBMISSIONS

 

 

 

 

Projects

 

Yes

Projects is where APQP or PPAP projects are created.  This is where “forms” are created and managed, using the database View.  There is complete flexibility on how Projects are created regarding what Part Number / Revision level is used.  Multiple Projects can be open at the same time, on the same Part Number and Part Revision level, or the same Part Number with different Part Revision Level, to allow complete flexibility to handle multiple customer / supplier submissions at the same time based on what Part Revision manufacturing is currently producing.  This can also handle the issue across multiple plant locations for internal projects.

 

A Project is defined by the following:

-        Part Number / Name and revision level

-        Which Customer to be sent to, or if Internal, or if coming from a Supplier – this project is based on only one of these options

-        Start and End Date

-        Status

 

Project Revision History is maintained

 

PPAP Submission Process

 

 

Yes

Very flexible PPAP Submission process, including, multiple partial submission, full submissions, and re-submissions.  The PPAP Project status includes: Pending, Interim, Approved, and Rejected

 

Project - Ability to assign each PPAP package a project number, associated program, and other unique identifiers (tagging for traceability)

 

 

Yes

 

Project - Ability to create customer specific requirements.

 

 

Yes

 

Project - Form Data Columns – Hide, Sort, and Pin options

 

 

Yes

 

Project - Form Data Rows – add below, copy below, move (drag and drop)

 

 

Yes

 

Project - Form Data Rows – hide / view rows in PFD, PFMEA, CP

 

 

Yes

 

Project All Forms view- PF, PFMEA, CP all in a single view

 

 

Yes

 

Project Form Configurator – PFD, PFMEA, CP

 

 

Yes

 

Project Form FMEA Action Item Tracker

 

Yes

The right side of the FMEAs forms come to life with the Action Item tracking capability – assigned to and due sate tracking.

Project Form Family – manage reusable lookups (control methods, failure modes, failure effects, process controls, measurement techniques, sample size, frequency, reaction plan, devices, etc.)

 

 

Yes

 

Project Form Templates

 

Yes

A database Form Template will include the ability to configure and store and reuse a Form View – for example OLD versus NEW FMEA views, this Customer view versus that Customer view, etc.  The View Template allows the configuration of almost any form.

Project Forms – ability to create multiple views, including dimensional control plans (DCP) and other combinations of PFD, PFMEA, ad CP information.

 

 

Yes

 

Project forms - PFD ability to auto-populate steps into PFMEA

 

 

Yes

 

Project forms - PFMEA ability to auto-populate steps into CP

 

 

Yes

 

Project forms - PFMEA ability to expand rows to capture multiple failure modes, causes, and effects

 

 

Yes

 

Project Forms - Provide users visibility within drop down with standard S, O, D descriptions

 

No

The training and documentation are a separate subject.  No one using spreadsheets complained that they could not remember the 1-10 ratings descriptions.

 

Project Forms - provides automatic merge cell view

 

 

Yes

 

Project Forms - Right side of FMEA - action item tracking

 

 

Yes

 

Project Forms Publish option

 

 

Yes

 

Project Forms revision control

 

 

Yes

 

Project Gantt Chart

 

 

Yes

A database app will include a simple Gantt chart, without all the hassles of a MS Project like tool, and more flexibility.

Allow for tasks to be related to the Gantt Chart and have a start and end date attributed to them, then show as graphical representations on the chart. If a task has just an end date, it will be show on the Gantt chart as a milestone.

 

Project Meetings

 

 

Yes

If needed, you can record the cross functional team involvement in the process.  If you are assigned to a team, you will receive an email notification.

Project Tasks – attachments

 

Yes

initial process capability studies, inspection results FAIR, Process Capability Studies, etc.

 

Project Tasks - Templates

 

 

Yes

A task template is re-usable task list – for example, the 18 PPAP items, an APQP task list, or any customer specific tasks, and more.

Project Tasks - Tracker

 

Yes

A simple task management process with flexibility to customize the task list.   A simple timeline with assignments and due dates is available.  By design, this is NOT a MS Project like tool – you are not forced to do anything to use the Task Tracker.

A new Project can be created by combining multiple task templates, as needed for this new Project.

If you are assigned a task, you will receive an email notification.

Project Tasks – ability to have unlimited sub-tasks

 

 

Yes

 

Project Tasks - Gantt charting display with sorting option

 

 

Yes

 

Project Tasks – spreadsheet like data entry

 

 

Yes

 

Project Tasks - configurator

 

Yes

Ability to have multiple task templates for different PPAP submission rules – internal and customer and suppliers.

 

Ability to select applicable PPAP deliverables by project/part/families.

 

 

Yes

 

Project - Team Members (customers, employees, suppliers)

 

Yes

Keep track of who has been involved.  Upload video conference files as an attachment.

 

Projects - Publish user definable PPAP submission elements into one PPAP zip file.

 

 

Yes

 

Projects – manage internal projects.

 

 

Yes

 

Projects – manage same part from multiple suppliers.

 

 

Yes

 

Projects – manage same part to multiple customers.

 

 

Yes

 

Projects - Ability to retain PPAP form revisions & audit trails for each PPAP element for document history progressions.

 

 

Yes

 

Projects - Ability to capture revision levels for each PPAP element.

 

 

Yes

 

Projects - Ability for all documents associated with PPAP submission to be locked when full disposition of the PPAP submission is established and all actions are completed.

 

 

Yes

 

Project - Ability to add additional fields to track data PPAP elements related to a part/product (i.e. customer specific requirements)

 

 

Yes

 

Project Forms - Automatic linkages between the DFMEA and PFMEA

 

 

Yes

 

Project Forms - Ability to be flexible & configurable to standard format changes (e.g. deleting columns on FMEAs, auto updates not forced, customizable templates and dashboard, reshuffling of column/rows, headers customizable, etc.)

 

 

Yes

 

Project - Ability to distinguish between pre-production and production for control plan (and other deliverables)

 

 

Yes

 

 

GAGE STUDIES

 

 

 

 

Gage Studies

 

Yes

One (1) Attribute and Two (2) Variable studies

-        GR&R Attribute Hypothesis Test Method

-        GR&R Variable Tolerance and TV Methods

-        GR&R Anova Method

Gage Studies Minitab Users

 

Yes

Two points:

1st. If you are ONLY using Minitab for Gage Studies, a single named user license is $1,200 per year. Source

2nd The Minitab Gage Studies reports are complicated, and annoying to your employees and customers – a simple report that shows the results is preferred by most.

 

Gage Studies – reusable across multiple PPAP Submissions

 

Yes

Gage studies can be stored in a library and reused in multiple projects.

 

 

SYSTEM MANAGEMENT

 

 

Ability to export PPAP package from software for local storage (ease of access)

 

 

Yes

Ability to use single sign-on (external & internal)

 

 

Yes

Ability to have a data back-up system.

 

 

Yes

Ability to support multiple/additional languages (i.e., English, Spanish, Chinese, etc.)

 

 

Yes

 

Sincerely,

 

John M. Cachat

PeProSo, LLC

jmc@peproso.com

www.linkedin.com/in/johncachat - happy to connect

 

Work travels at the speed of trust…